Rough Grade and Pool Prep

The pool guy is doing a rough grade (smoothing out the ruts and rough spots around the house) and prepping the back yard for the pool.  Work on the pool should commence tomorrow, and be finished in about 6 weeks.  I want one of those toys!!!