
All stone and brick work has been completed. They’ll probably do the acid-wash and cosmetic stuff after the rains pass. (Supposed to rain all week, and it’s quite muddy) Meanwhile, work continues inside – the ceilings are being stomped, and walls are being prepared for paint. Cabinets should be arriving soon.